Susan Reynolds, PE, RA, LEED AP
Assistant Professor, Joined TU in 2011
EDUCATION
Master of Science in Civil Engineering, University of Illinois, 2004
Bachelor of Architecture, Auburn University, 2000
Bachelor of Arts in Spanish, Auburn University, 2004
PROFESSIONAL REGISTRATION AND MEMBERSHIPS
Professional Engineer, Commonwealth of Virginia
Registered Architect, District of Columbia
LEED Accredited Professional
Member, ICOMOS (International Council on Monuments and Sites)
Member, AISC (American Institute of Steel Construction)
ACADEMIC EXPERIENCE
Assistant Professor, Tuskegee University, 2011-present
Courses taught:
- ARCH 343 Structures I
- ARCH 344 Structures II
- ARCH 443 Structures III
- ARCH 364 Historic Preservation I
- CSMT 435 Soils and Foundations
- CSMT 352 Construction Safety
Graduate Research Assistant, University of Illinois, 2002-2004
Graduate Teaching Assistant, University of Illinois, 2002-2004
PROFESSIONAL EXPERIENCE
Structural Engineer, AECOM, Washington, DC 2007-2010
Structural Engineer, Robert Silman Associates, Washington, DC 2004-2007
ICOMOS International Intern, ICCROM, Rome, Italy, 2006
RSA Fellow for Preservation Engineering, National Trust for Historic Preservation, Washington, DC, 2004-2005
Intern Architect, Thompson, Ventulett, Stainback & Associates, Chicago, Illinois, 2000-2002
Intern Architect, Olsen and Associates, Champaign, Illinois, 2002
Intern Architect, Architects Equities, Champaign, Illinois, 1999
Intern Architect, ArchitectureWorks, Birmingham, Alabama, 1998
RESEARCH AND GRANTS
Research Interest
- Structural Analysis of Historic Construction
- Historic Preservation Technology and Pathology
- Structural-Architectural Expression and Innovation
Grants
- Getty Campus Heritage Grant. Educational Component: Research, Assessment and Planning for a Historic Structure with a Focus on Non-Destructive Testing
Methods, 2011.
PRESENTATIONS, PAPER PUBLICATIONS AND EXHIBITIONS
Reynolds, S. "The Varner House, Tuskegee, Alabama: Preliminary Structural Condition Assessment," an internal report to University leadership, 2011.
Reynolds, S. “Preservation Engineering Trends: the U.S. approach in the context of international practice,” US/ICOMOS Newsletter, 2006
SERVICE: UNIVERSITY, DEPARTMENT AND COMMUNITY
University:
- Member, Varner House Restoration Committee, 2011
School and Department:
- Chair, Computer Technology Committee, 2011
- Provided training to School faculty on new University email and cloud computing system, 2011
- Redesigned and launched new Robert R. Taylor School of Architecture and Construction Science webpages on the tuskegee.edu domain, 2011
Community and Profession:
- Created YouTube Channel, StrlEngVideoTutorial, which contains lectures and example problems for the TU students and the public, 2011
PROJECTS
Project engineer, Mercy Clinic Expansion. Janesville, Wisconsin, 2010. With AECOM.
Task leader and field engineer, Condition Assessments of Approximately 80 Existing Buildings Along Proposed Second Avenue Subway Construction. New York,
New York, 2010. With AECOM.
Project engineer, Structural Condition Assessment of Big Meadows Lodge. Shenandoah National Park, Luray, virginia, 2009. With AECOM.
Project engineer, Various Renovation Projects at the National Museum of Natural History. Washington, DC, 2009. With AECOM.
RFP author, structural pre-design and criteria for the National Museum of Health and Medicine, Forest Glen, Maryland, 2009. With AECOM.
RFP author, structural pre-design and criteria for the Navy Medical Bio-Defense Research Laboratory. Ft. Detrick, Maryland, 2009. With AECOM.
Project engineer, The Pentagon, various structural analysis and project management tasks. Arlington, Virginia, 2008-2009. With AECOM.
Project engineer, Squadron Operations Building. West Virginia Air National Guard, Martinsburg, West Virginia, 2008. With AECOM.
Project engineer, Fire Station. West Virginia Air National Guard, Martinsburg, West Virginia, 2008. With AECOM.
Project engineer, Base Supply. West Virginia Air National Guard, Martinsburg, West Virginia, 2008. With AECOM.
BIM Implementation Lead, Defense Media Activities Building and Adjudication Co-Location Facility. Ft. Meade, Maryland, 2007. With AECOM.
Project engineer, structural design of 4 small buildings on the campus of the Regional Correctional Facility. Ft. Leavenworth, Kansas, 2007. With
AECOM.
Supporting engineer, Renovations of West Building of the National Gallery of Art. Washington, DC, 2008. With AECOM.
Project engineer, Structural Investigation of I.M. Pei's East Building of the National Gallery of Art. Washington, DC, 2006. With RSA.
Supporting engineer, Advanced Research and Technology Building, University of Virginia. Charlottesville, Virginia, 2006. With RSA.
Supporting engineer, Condition Assessment of a Campus of Approximately 15 Buildings at the abandoned Blue Ridge Hospital. Charlottesville, Virginia, 2005.
With RSA.
Project engineer, Structural Blast Assessment and Upgrades to the National Portrait Gallery. Washington, DC, 2005. With RSA.
Project engineer, Condition Assessment of Mies van der Rohe's Farnsworth House. Plano, Illinois, 2005. With the National Trust for Historic
Preservation.
Intern architect, assisted with construction documents for McCormick Place West Expansion. Chicago, Illinois, 2002. With TVS.
Intern architect, construction administration of Washingont Convention Center. Washington, DC, 2001. With TVS.
Intern architect, renovation of North Riverside Park Mall. Riverside, Illinois, 2000. With TVS.
Back to Faculty and Staff